How solar projects can be developed efficiently

Solar developers face significant challenges, such as the inefficient transition from site selection to initial project design phases and the complex, time-consuming process of configuring site files due to the different labeling and structuring requirements of different platforms.
These issues complicate data exchange between developers and location analysts and increase the risk of data loss or errors in transferring data between platforms, which can drive up project costs. Furthermore, the lack of comprehensive and easily accessible location data on design platforms often leads to inaccurate initial designs.
The integrated PVcase platform meets the urgent need for a reliable solution for solar project development. With AO Prospect, Ground Mount, and Yield as part of the software package, it covers all project development phases, from site selection to yield calculation, effectively breaking down the roadblocks in planning and construction. All of this results in developers completing their projects faster and more efficiently, accelerating the global transition to clean energy.
Roman Affolter, Pre-Sales Engineer at PVcase, will explain and demonstrate how using concrete examples at a free webinar hosted by the trade magazine photovoltaik on July 23, from 5:00 PM to 6:00 PM. The moderator is Senior Editor Hans-Christoph Neidlein. (hcn) You can register here.
photovoltaik