More power through Arkel station: waiting list decimated

This article has a paid access block, which means that you can only read some of the content if you are logged in and have a valid subscription.
Grid operator Stedin can immediately provide 84 of the 114 businesses on the waiting list in and around Gorinchem with a new or more powerful connection to the grid. By increasing the load on the Arkel substation, approximately 25 MW of capacity will be freed up.
energeia




